• 100kw 200kw 400kw 800kw 1MW 2MW Biogas Power Station
  • 100kw 200kw 400kw 800kw 1MW 2MW Biogas Power Station
  • 100kw 200kw 400kw 800kw 1MW 2MW Biogas Power Station
  • 100kw 200kw 400kw 800kw 1MW 2MW Biogas Power Station
  • 100kw 200kw 400kw 800kw 1MW 2MW Biogas Power Station

100kw 200kw 400kw 800kw 1MW 2MW Biogas Power Station

After-sales Service: Yes
Warranty: Yes
Power: 50-200kw, 100kw - 10MW
Certification: CCC, ISO, CE, ISO, CE
Output Type: AC Three Phase
Standard: Nonstandard
Customization:
Gold Member Since 2009

Suppliers with verified business licenses

Manufacturer/Factory

Basic Info.

Model NO.
KX-1200
Transport Package
Seaworthy Packing
Specification
ISO, CE
Trademark
huanhai
Origin
Shandong, China
Production Capacity
200 Sets

Product Description

MODEL Gas output Generator power Material consumption
KX-50B 50M3/hour 20Kw 25 - 30kg/Hour
KX-100B 100M3/hour 30Kw 50 - 60Kg/Hour
KX-150B 150M3/hour 50Kw 70 - 90Kg/Hour
KX-200B 200M3/hour 70Kw 100 - 120Kg/Hour
KX-300B 300M3/hour 100Kw 150 - 160Kg/Hour
KX-400B 400M3/hour 120Kw 200 - 220Kg/Hour
KX-600B 600M3/hour 200Kw 300 - 320Kg/Hour
KX-800B 800M3/hour 260Kw 400 - 420Kg/Hour
KX-1000B 1000M3/hour 350Kw 500 - 520Kg/Hour
KX-1200B 1200M3/hour 400Kw 600 - 620Kg/Hour
KX-1500B 1500M3/hour 500Kw 750 - 800Kg/Hour
KX-2000B 2000M3/hour 700Kw 1000 - 1200Kg/Hour
KX-2400B 2400M3/hour 800Kw 1200 - 1400Kg/Hour
KX-2600B 2600M3/hour 880Kw 1400 - 1500Kg/Hour
KX-3000B 3000M3/hour 1MW 1600 - 1800Kg/Hour

100kw 200kw 400kw 800kw 1MW 2MW Biogas Power Station

Raw Material:


Any type of Agro-Forestry waste can be used with moisture below 18%. 

Biomass gasifier can match generator 20Kw up to 800Kw.Groundnut-shell, Sugarcane residue, Caster Shells/Stalk, Saw dust, Coffee Husk, Paddy Straw, Sunflower Stalk, Cotton Stalks, Tobacco waste, Mustard Stalk, Jute waste, Bamboo Dust, Tea waste, Wheat Straw, Palm husk, Soybeans husk, Rice Husks, Forestry wastes, Waste paper, Cardboard, Wood Chips and many other Agro wastes.


100kw 200kw 400kw 800kw 1MW 2MW Biogas Power Station



 

Working Principle:

 

The principle of gasifying process: biological materials enter reactor, and undergo heat drying. As the temperature increases, the volatile is separated out and split. After splitting, the gas and carbon meet supplied air in the oxidation area and combustion takes place. The combustion results in CO and vapor. The heat from combustion is utilized to maintain dryness, splitting reaction and endothermic reaction of the underneath reversion area. The gas resulted from the combustion goes through the reversion area and reacts with carbon layer (C+CO2 =2CO, C+HO2 =H2 +CO), which produces burnable gas consisting of CO, H2, CH4, CmHn.

100kw 200kw 400kw 800kw 1MW 2MW Biogas Power Station

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now